To those related companies:
The new version of standard of Electromagnetic compatibility—Limits—Limits for harmonic current emissions(equipment input current≤16A per phase) (GB17625.1-2012) had been issued on Des 31 2012 and will be taken effect on July 1st, 2013 to instead of GB17625.1-2003. The new standard is related to many CQC(voluntary certification products) lighting products, the requirements on version change for those products are as following.
1. The new standard has been taken effect on July 1st, 2013, since this day, the manufacture should ensure its products in conformity with new standard GB17625.1-2012.
2. For the CQC certificates with old standard GB17625.1-2003, the applicant can fill in a change application on the CQC website for the new version of standard GB17625.1-2012. the lighting products related to this version change are listed below:
Category No | Name of Production |
004008 | Particular requirements for d.c.or a.c. supplied electronic step-down convertors for filament lamps |
004011 | Particular requirements for d.c.or a.c. supplied electronic ballasts for discharge lamps(excluding fluorescent lamps) |
004012 | Particular requirements for electronic invertors and convertors for high-frequency operation of cold tubular discharge lamp(neon tubes) |
004014 | Particular requirements for d.c.or a.c. supplied electronic control gear for LED modules |
004016 | Miscellaneous Electronic Circuits Used With Luminaires |
010001 | Emergency Lighting |
010004 | Safety requirements of luminaires for road and street lighting |
010006 | Safety requirements for floodlights |
010008 | Lighting Chains |
010010 | Air-handling Luminaires For Fluorescent Lamp |
010011 | Particular requirements - Luminaires for stage lighting,television,film and photographic studios(outdoor and indoor) |
010017 | Self-ballasted Fluorescent Lamps |
010025 | Self-ballasted LED Lamp For General Lighting Services |
010027 | LED modules for general lighting—Safety specifications |
Notice:Before you make a change application, please check the standard on your certificate, to make sure of the standard GB17625.1 on it.
3. The applicant should complete change application for their certificates before the next follow-up factory inspection and this change should be completed before July 1st, 2014. The certificates will be suspended if the change is overdue, and CQC will withdraw the certificates for those cannot complete certificate changes before Oct 1st, 2014.
China Quality Certification Center